For a long time, the Jönköping region has held a strong position as an optimal logistics location with favourable conditions for next-day deliveries throughout the Nordic region. The land in question covers about 200,000 square metres adjacent to the Torsvik industrial area by the E4, parallel to the Hyltena interchange. 

Catena to build groundbreaking logistics facility for Elgiganten

Catena has signed an agreement with Elgiganten for the construction and rental of a new logistics facility in Jönköping totalling 86 600 square metres. The estimated moving in date for Elgiganten is spring 2024. Both Catena and Elgiganten have high level sustainability requirements and the objective is for the new facility to be certified under both BREEAM Excellent and WELL Core.A future WELL certification would mean that it might be the first logistics facility in Sweden that meets the WELL requirements and thus sets a new standard for logistics properties in terms of social sustainability. 

Press release 29 June 2022

Glulam the obvious choice

The project has set demanding sustainability requirements, with the aim of achieving environmental certification in accordance with BREEAM Excellent. This certification imposes exacting demands on the entire production process, not least regarding the choice of materials. That is why we are using glulam for the building frame. In total, there are over 500 beams that are 24 meters long and almost 2 meters high.

Press release April 25, 2023.

Caring for both people and nature

Together with Elgiganten we plan for solar cell systems, rainwater collection systems, social spaces on the roof and well-planned green areas to conserve and benefit biodiversity in the area.

Facts

Land area: 2000,000 sqm
Area: Torsvik industrial area, Hyltena interchange
Municipality: Jönköping
Status: Ongoing construction

Would you be interested in establishing operations here?

You are welcome to contact us to talk about opportunities in the region.